AEVA Homepage
Forum Home Forum Home > AEVA Branches > AEVA Perth Branch
  Active Topics Active Topics
  FAQ FAQ  Forum Search   Register Register  Login Login

WA DPI Modification Form

 Post Reply Post Reply
Author
Message
  Topic Search Topic Search  Topic Options Topic Options
Richo View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 15 June 2008
Location: Perth, WA
Online Status: Offline
Posts: 1336
  Quote Richo Quote  Post ReplyReply Direct Link To This Post Topic: WA DPI Modification Form
    Posted: 02 August 2008 at 4:14pm
If you are in WA you will need to fill in this DPI form BEFORE you start your eV conversion:
http://www.dpi.wa.gov.au/mediaFiles/lic_modform_prodveh.pdf
Battery + controller + ACIM - ICE = eV
Back to Top
acmotor View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 25 April 2007
Location: Perth,Australia
Online Status: Offline
Posts: 2475
  Quote acmotor Quote  Post ReplyReply Direct Link To This Post Posted: 02 August 2008 at 6:46pm
Are you certain ?
Is this new / overriding NCOP14 and the EV specific form in it ?
This form has zip to do with an EV ???

I thought our EV conversion contact was..

Department for Planning and Infrastructure
Welshpool Licensing Centre
Vehicle Safety Branch
21 Murray Rd South
Welshpool WA 6106.

Red Suzi   
3PIM, the workhorse of industry and now the racehorse of transportation.
Back to Top
Richo View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 15 June 2008
Location: Perth, WA
Online Status: Offline
Posts: 1336
  Quote Richo Quote  Post ReplyReply Direct Link To This Post Posted: 02 August 2008 at 9:31pm
Actually NCOP14 refers to this form in the first paragraph.
The eV conversion contact is the same place.
NCOP14 is the guideline for eV conversion and has a final checklist where as the form I gave a link to is the permission to allow you to make it an eV in the first place.

I will ring them on monday to see if they would only accept NCOP14.
Battery + controller + ACIM - ICE = eV
Back to Top
Richo View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 15 June 2008
Location: Perth, WA
Online Status: Offline
Posts: 1336
  Quote Richo Quote  Post ReplyReply Direct Link To This Post Posted: 04 August 2008 at 4:31pm
I rang the DPI today (Technical section).
Unfortunately after many attempts at different times during the day I have not got to speak to anyone.
I rang the head office and they confirmed I was ringing the corret number.

Maybe tomorrow....
Battery + controller + ACIM - ICE = eV
Back to Top
Richo View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 15 June 2008
Location: Perth, WA
Online Status: Offline
Posts: 1336
  Quote Richo Quote  Post ReplyReply Direct Link To This Post Posted: 07 August 2008 at 4:39pm
I got hold of the DPI today.
Asked what I needed to fill out for an eV conversion.
Answer: you need the form I gave a link to at the top of the page.
You need to get approval BEFORE you start.

NCOP14 is the guidlines you must build it to before it will pass.
The checklist in NCOP14 is what you use at the time of inspection.
Battery + controller + ACIM - ICE = eV
Back to Top
acmotor View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 25 April 2007
Location: Perth,Australia
Online Status: Offline
Posts: 2475
  Quote acmotor Quote  Post ReplyReply Direct Link To This Post Posted: 08 August 2008 at 9:42am
Done.
I've never written 'not applicable' so many times on a form before !
Red Suzi   
3PIM, the workhorse of industry and now the racehorse of transportation.
Back to Top
antiscab View Drop Down
Admin Group
Admin Group

Forum Admin

Joined: 25 November 2007
Location: Perth, WA
Online Status: Online
Posts: 1500
  Quote antiscab Quote  Post ReplyReply Direct Link To This Post Posted: 08 August 2008 at 8:05pm
ditto, just sent mine off.

Back to Top
Richo View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 15 June 2008
Location: Perth, WA
Online Status: Offline
Posts: 1336
  Quote Richo Quote  Post ReplyReply Direct Link To This Post Posted: 09 August 2008 at 10:29am
Yeah it will be N/A for most of it.
Just bureaucratic red tape.
Battery + controller + ACIM - ICE = eV
Back to Top
acmotor View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 25 April 2007
Location: Perth,Australia
Online Status: Offline
Posts: 2475
  Quote acmotor Quote  Post ReplyReply Direct Link To This Post Posted: 09 August 2008 at 11:16am
Just go with it for now,
One day we will have a "request to convert a vehicle to Electric power" form. (with a special tick box for prius owners ! )
Red Suzi   
3PIM, the workhorse of industry and now the racehorse of transportation.
Back to Top
Richo View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 15 June 2008
Location: Perth, WA
Online Status: Offline
Posts: 1336
  Quote Richo Quote  Post ReplyReply Direct Link To This Post Posted: 26 August 2008 at 9:33pm
I rang the DPI toady to see how they were going.
When they answered all I could hear was laughing
No only jokin they were very nice.

"My form has progressed in the queue" they told me.
But it is still over a week away before I'll get any answers.

I'm itchn to do some convert'n
Battery + controller + ACIM - ICE = eV
Back to Top
acmotor View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 25 April 2007
Location: Perth,Australia
Online Status: Offline
Posts: 2475
  Quote acmotor Quote  Post ReplyReply Direct Link To This Post Posted: 23 September 2008 at 9:52am
waiting ?
Red Suzi   
3PIM, the workhorse of industry and now the racehorse of transportation.
Back to Top
Richo View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 15 June 2008
Location: Perth, WA
Online Status: Offline
Posts: 1336
  Quote Richo Quote  Post ReplyReply Direct Link To This Post Posted: 23 September 2008 at 1:13pm
Update.

I spoke to DPI last week and they were in the middle of processing my form.
The indication I got was I would expect a response letter in the next couple of days.
Battery + controller + ACIM - ICE = eV
Back to Top
Richo View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 15 June 2008
Location: Perth, WA
Online Status: Offline
Posts: 1336
  Quote Richo Quote  Post ReplyReply Direct Link To This Post Posted: 23 September 2008 at 10:18pm
New update.
Got letter today.

Usual gumph.
You can do as long as an engineer signs off on it...
Battery + controller + ACIM - ICE = eV
Back to Top
barney View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 08 October 2008
Location: Perth AUS
Online Status: Offline
Posts: 19
  Quote barney Quote  Post ReplyReply Direct Link To This Post Posted: 11 November 2008 at 3:23pm
So, is there a list of engineers who can advise/do the sign off?
barney
Plan: electric handmade vehicle, converting an MR2 to Mr240. First attempt, DC, 150V plus creature comforts like r/c A/c.
handmade_car
Back to Top
Richo View Drop Down
AEVA Member
AEVA Member
Avatar

Joined: 15 June 2008
Location: Perth, WA
Online Status: Offline
Posts: 1336
  Quote Richo Quote  Post ReplyReply Direct Link To This Post Posted: 12 November 2008 at 11:38am
Yeah it's on another thread in the Perth section.
Battery + controller + ACIM - ICE = eV
Back to Top
 Post Reply Post Reply

Forum Jump Forum Home Forum Permissions View Drop Down

Bulletin Board Software by Web Wiz Forums® version 9.07
Copyright ©2001-2008 Web Wiz

This page was generated in 0.125 seconds.